CASE STUDIESOakley

Don Flynn Plumbing has installed Noritz tankless water heaters at the headquarters of Oakley, a sunglass factory in Lake Forest, CA. When completed, this job will have a total of 25 N-1321M-ASME with 10 multi-system units, and 15 multi-system units.  These units will supply hot water to 25 lens cleaning machines.

 

Electric tank water heaters were previously used on this installation but were not able to supply the demand of the lens cleaning machines, which are operated twenty-four hours a day. The Noritz units will be able to supply an endless stream of hot water and save much needed room within the building as well.

 

PROPERTY PROFILE

Location: Oakley Headquarters
City: Lake Forest, CA
Max. occupancy:

NORITZ INSTALLATION

Location: Outdoor installation, roof top.
Applications: 25 lens cleaning machines
Vent set-up: Outdoor vent cap (VC-132).

NORITZ HEATER PROFILE

Noritz units: System #1: Ten N-1321M-ASME, System #2: Fifteen N-1321M-ASME
Noritz accessories: Isolator valves (IK-WV-9-TH) and System Controllers (SC-201-12M & SC-201-24M)
Fuel type: Natural gas
Gas consumption:
System #1: Max. 3,8000,000 btuh – Min, 22,500 btuh
System #2: Max. 5,700,000 btuh – Min, 22,500 btuh
Flow rate performance:
System #1: 0.7 – 132.0 GPM
System #2: 0.7 – 198.0 GPM
Temperature settings: 100-180 degree F
Warranty: 5 years on heat exchanger and parts (non-prorated).